Temporary Works Guidance Notes

Practical, standards-referenced guidance for TWCs, site engineers and designers — written to be read on site as well as at a desk. Each note ends with a site control checklist you can lift straight into your briefings.

Rev AIssued July 2026Aligned to BS 5975:2024
Engineering team using the Temporary Works Toolbox in the office

Need the whole set on paper?

The printable version combines all four notes with a cover sheet, formatted for A4. Open it and print to PDF, or download the pre-built PDF.

Open printable version   Download PDF

Important. This guidance note is provided for general information and awareness only. It is not a design, a design check, or project-specific advice, and it must not be relied upon as such. Temporary works must be designed and checked by competent persons under a temporary works procedure consistent with BS 5975:2024, using project-specific loads, ground information and standards current at the time of design. Standards cited are those understood to be current at the date of issue — always confirm the latest edition and any national annex or amendment before use. No liability is accepted for use of this note outside that context.